Imagine you are a doctor running behind schedule due to the needs of a patient in the morning. This has backed up all your other appointments for the day and has led to several grumpy and rude patients. How do you balance being a good listener and providing solid care with the logistics of the day?

Answers

Answer 1
By helping those who actually need emergency services and then afterwards go along with the others
Answer 2

The best way to balance being a good listener and providing solid care with the logistics of the day is to:

Get a competent assistant that you can delegate some work to:

A doctor is a person who takes care of the sick, injured or afflicted and prescribes drugs to them after careful medical examination and diagnosis.

As a result of this, we can see that there is a lot of work to be done by a doctor who is behind schedule and has to attend to grumpy and rude patients, while being a good listener.

The best solution is to get a competent assistant you can share the work with so that the work load would reduce and you would be more efficient.

Read more here:

https://brainly.com/question/13577529?source=archive


Related Questions

a neurosurgeon has drilled a hole through her patiens skull and is preparing to remove glioma. list in order the membranes she must cut through to reach the cerebral cortex

Answers

1) dura mater

2) arachnoid mater

3) pia mater

A neurosurgeon has drilled a hole through her patients skull and is preparing to remove glioma. list of the membranes she must cut through to reach the cerebral cortex are

1) Dura mater

2) Arachnoid mater

3) Pia mater

What is Arachnoid mater?

Arachnoid mater: Linked to the dura mater on the side closest to the CNS, this intermediate layer contains a network of fibers and collagen that exists as part of the suspension system that permits the rescue of the brain and spinal cord from sudden impact.

Three layers of membranes understood as the meninges rescue the brain and spinal cord. The delicate inner layer is named the pia mater. The middle layer is named the arachnoid. It exists a web-like structure filled with fluid that cushions the brain. The tough outer layer exists called the dura mater.

To learn more about Arachnoid mater refer to:

https://brainly.com/question/11877117

#SPJ2



Select the correct answer.
What does positive identification in comparative dental identification indicate

Answers

Positive identification refers the similarity of the opinion about antemortem and postmortem data.

What is Positive Identification?

The antemortem and postmortem data that is match in sufficient detail to make the opinion that they are from the same individual is known as positive identification so we can conclude that positive identification refers the similarity of the opinion about antemortem and postmortem data.

Learn more about identification here: https://brainly.com/question/26320301

Answer:

Lack of evidencce

Explanation:

Overall, piaget _____ infant'a and children's cognitive abilities, but ____ those of adolescents

Answers

Answer:

underestimated; overestimated.

Sometimes physicians place a catheter called a central line, that leads directly to the heartThis vein sits below the clavidle. What is the name of this vein?

A-Brachial
B-Subclavian
C-Radial
D-jugular

Answers

Answer:

B) Subclavian

Explanation:

I hope this helps :) Tell me if I am wrong.

B) Subclavian would be your answer
Other Questions
PLS HELP ASAPLook at this image by Takashi Murakami and analyze which Principles he used in this piece and where he used them. As a reminder the Principles of Art/Design are:MovementRepetitionEmphasisContrastBalanceRhythmUnity/Harmony help plz can someone simplify 3 to the power of 2 times 3 to the power of 3 I ONLY NEED IDEASQ: Write a story on " It was a great disappointment but this was a blessing in disguise".I only need a main idea or prompt to write on, please share ideas.(The sentence needs to be included in the story it can be included in beginning, starting , ending or middle, there are no restrictions to that) Please HELP! What does Anne realize about the relationship between the van Daans and her mother?Everything is the van Daans' fault.Her mother has caused some of the problems.Mr. Dussel has stirred up the van Daans.Anne has caused most of the problems. do all organisms receive the same amount of energy? explain Sandra y Santiago (Ir) a la playa todos los dias.ibanibaibamosibas Complete the following sentence. Even if someone does not get the job after an interview, she or he should be sure to ____ the person who interviewed her or him. In JKL, k = 4.1 cm, j = 3.8 cm and J=63. Find all possible values of K, to the nearest 10th of a degree. What would be the best title for this list? A football player completes a pass 67.9% of the time.Find the probability that the first pass he completes is the second pass. Find the length of ST Most organisms carry out cellular respiration. Which of the following best describes cellular respiration?A. a process in which organisms release oxygen to the air B. a chemical process in which cells use light energy to make food C. a mechanical process in which humans take in oxygen from the air D. a chemical process in which cells use oxygen to release energy from food Work out the value of 5418 6 Civil rights movement Someone please help Camila drew a triangle with a side that is 24inches long and a side that is 18 inches long.Which of the following could be the length of thethird side of the triangle that Camila drew? SelectTHREE that apply.42 inches40 inches18 inches7 inches6 inches5 inches Which statement best completes the timeline of German history?Prussian Germanyleaders unitegrows into asmall German major militarystates.power.Germany isdefeated inWorld War 1.Adolf Hitlerrises topower inGermanyGermany isdividedfollowingWorld War II.?A. Germany is ruled by the Holy Roman Empire.B. Germany establishes a democratic government.C. Germany is occupied by Russia and Great Britain.D. Germany is controlled by communist leaders. What is the chemical formula for Tetrasulfur pentoxide? What is the area of thiscomposite figure?A. 112 square inchesB. 110 square inchesC. 124 square inches Box A weighs 1.4 pounds, box B weighs 3.2 pound, and box C weighs 2.5 pounds. What is the combined weight of box A and Box C? He was nervous about the upcoming play but several successful rehearsals gave him confidence